How Long Does It Take To Get Solar Subsidy Credited?

  • Home
  • > Blogs
  • > How Long Does It Take To Get Solar Subsidy Credited?
image

Published: 18 Aug, 2025 | By Solar

Switching to solar energy is one of the smartest financial decisions a household can make today to save money. You don’t just save money, you reduce your electricity bill, and also do something good for the environment. But let’s be honest, installing solar panels is not cheap. That’s where the solar subsidy comes in. It’s a government scheme to help families afford solar systems without too much financial pressure.

But once you install your solar system, one big question comes up:

How long does it take to get solar subsidy credited?

And that is going to be the aim of this article, to tell you exactly whatever you need to know. How long it takes, what are the steps involved, why delays happen or how to avoid them. So wherever you’re from this article is for you.

What Is A Solar Subsidy?

Solar subsidy is the monetary help that the government gives to people who install rooftop panels at their home. It was introduced to not just encourage people to switch to renewable energy but also makes them feel appreciated for being a good and smart human. The Ministry of New and Renewable Energy (MNRE) runs this scheme and gives the money after the installation and inspection of the panels.

As of now, you can get up to 40% subsidy on small systems, that is up to 3 kW and up to 20% subsidy on systems that are between 3–10 kW.

This scheme is part of the Pradhan Mantri’s Surya Ghar Muft Bijli Yojana, which is there to promote rooftop solar for middle-class families, especially in tier 2 and tier 3 towns.

How Long Does It Take To Get Solar Subsidy In India?

Now coming to the main question:

How long does it take to get a solar subsidy credited into your bank account?

The solar subsidy credit time in most cases is around 60 to 120 days (2 to 4 months) from the date of installation and submission of all necessary documents. However, this can vary depending on:

  • Which state you live in
  • Your local electricity board (DISCOM)
  • The number of applications in your area
  • How fast your paperwork is processed
  • The company you choose for installation

If you go with a registered and experienced company like Spectra Solar Power, a trusted name in the solar panel business, the whole process becomes smoother and quicker.

Step-by-Step: How the Subsidy Gets Credited?

Understanding the step-by-step process will help you know where things are getting delayed.

1. System Installation

Once you decide to install a rooftop solar system, your vendor (installer) completes the setup at your home.

Make sure your vendor is MNRE-approved. Companies like Spectra Solar Power, one of the best solar panel companies in India, are already registered and know how to manage the subsidy process correctly.

2. Net Meter Installation

Your electricity board installs a net meter at your home. This helps you send unused electricity back to the grid and receive credits on your bill.

3. Inspection and Approval

A DISCOM officer visits your home for an inspection. They check if the system is working properly and installed as per government guidelines.

4. Generation Certificate

Once the inspection is successful, you get a certificate confirming your system is generating solar electricity. This is an important step to process your subsidy.

5. Document Submission

Your vendor or you must upload key documents like:

  • PAN card
  • Aadhaar card
  • Electricity bill
  • Bank passbook copy
  • Photos of the installed system

6. Subsidy Disbursement

After verification, your solar panel subsidy disbursement time officially begins. The subsidy amount is then sent directly to your bank account.

Common Reasons For Delay

Sometimes, even after installing the system and doing all the paperwork, your subsidy might be delayed. Here are the main solar subsidy delay reasons:

1. Incomplete or Incorrect Documents

One of the most common reasons. Even a small mismatch in your name, bank account number, or Aadhaar can cause the application to get rejected or stuck.

2. Slow Response from DISCOM

In many states, the electricity boards are understaffed or overburdened, which slows down inspections and approvals.

3. Portal Errors

The national or state solar portals sometimes face technical issues. Files don’t upload, pages crash, or information doesn’t update—delaying the process.

4. Vendor Not MNRE Approved

If your installer is not on the MNRE-approved list, your application may not even go through.

That’s why it’s important to go with trusted players like Spectra Solar Power, who are officially registered and experienced in handling the process.

How to Track Your Subsidy Application?

You can track your subsidy application status using the National Rooftop Solar Portal:

  • Visit Govt Portal
  • Log in using your application details
  • Check each step: installation, inspection, certificate, and payment

If any step shows "pending" or "rejected," follow up with your vendor or DISCOM office.

City-wise Average Subsidy Disbursement Time

Here's a general idea of how long to get solar subsidy in India, based on city-specific trends:

City Estimated Subsidy Time
Pune 60 to 90 days
Jaipur 75 to 100 days
Lucknow 80 to 120 days
Nagpur 70 to 100 days
Surat 60 to 110 days
Bhopal 90 to 130 days

Remember, this is an average. In many cases, if the paperwork is clean and the vendor is proactive, the subsidy comes much faster.

What If You Don’t Receive Your Subsidy After 4 Months?

If your solar subsidy credit time has crossed four months, and you still haven’t received the money, don’t panic. Here’s what you can do:

  • Check Status on Portal – Look at each stage of the application
  • Contact Your DISCOM Office – Ask about your file status
  • Talk to Your Installer – They can raise a request or follow up
  • Email MNRE Support – If nothing works, raise a formal complaint

How to speed up the process?

Want your solar panel subsidy disbursement to be faster? Follow these tips:

  • Choose a good vendor like Spectra Solar Power, who knows how to manage the paperwork
  • Check and double-check your documents before uploading
  • Be proactive – Don’t wait for updates; follow up with your installer and DISCOM
  • Keep all receipts and records in case you need to raise a complaint

Why Choose Spectra Solar Power?

Spectra Solar Power is not just another vendor. They’re experts in rooftop solar systems, especially for homes in tier 2 and tier 3 cities. They provide on-grid solar systems that qualify for government subsidy and handle everything from installation to paperwork.

If you're looking for the best solar panel company in India, Spectra is a name people trust—because they know how to make things easy, affordable, and hassle-free.

Want to get into the solar panel business? Spectra can also help you get started.

Conclusion

So, how long does it take to get a solar subsidy credited?

Usually between 2 to 4 months, depending on your location, electricity board, and the vendor you choose.

The process may sound long, but if done properly, it's very much worth the wait. The money comes directly into your bank account, and it reduces the total cost of your solar system by a big amount.

To make things easier and faster, always work with a company that understands the process. That’s where Spectra Solar Power makes all the difference.

whatsapp